CTD Continuous Planning Standard

CPS-1.

Version 1.0 · October 2026

A plan is not a document you make at 07:00. It is a system that has to stay right all day. CPS-1 sets out the five rules Connect the Dots is built around.

How a plan moves through Connect the Dots

The clauses

  1. CPS-1.1

    Constraint completeness

    Time windows, multiple capacity dimensions, skills such as ADR and vehicle shifts are hard requirements. A job that cannot be planned is reported with a reason, never dropped silently.

  2. CPS-1.2

    Cost truth

    Plans are optimized against what vehicles really cost: a fixed cost per vehicle, a cost per kilometre and a cost per hour.

  3. CPS-1.3

    Continuous replanning

    Every change during the day produces a new version of the plan. Stops that are committed or completed stay exactly where they are.

  4. CPS-1.4

    Traceability

    Every plan records its version, input, settings and key figures, so it can be explained and reproduced. Idempotent requests make retries safe.

  5. CPS-1.5

    Data sovereignty

    Hosted in the European Union, built on open map data, with a full export of every plan and no lock in.

How Connect the Dots implements CPS-1

Connect the Dots is built to CPS-1. Try it free for 30 days with your own data, and check each clause against your hardest planning day.